I think I will be doing a lot of posting on building the cabinets...
I completed assembling the uppers and bases, with the exception of the corner cabinets. Everything went together pretty easily - no problems. Once we get back into town, I should be able to get the corners, pantry and double-oven cabinets done in about 6 hours.
I have decided not to put the backs on cabinets (3/8" maple ply) until I have mounted all the drawer slides, etc. This should make that part of it simpler.
Attic Upgrade Part 4 – Insulation Done
-
I finished off the prep work in the attic and blew in all the insulation on
Saturday. We ran the blower for about 4 hours, and we put about 1700 pounds
of ...