Life is what happens when you are planning what you are going to do next: Two trips out of town for work and getting sick put a temporary stop on the kitchen. I haven't been been able to work on the cabinets for a couple of weeks.
I am looking forward to this weekend. I want to at least get the cabinet boxes complete and the kick-plate drawer assemblies done.
Here is the design for the kick-plate drawers. Basically, the structure will be 2x4 drawer bays with 3 inch drawers. The inset of the drawers will be only 2 inches under the cabinets - so that access will be easy. They will be almost 3 feet wide where possible, so we can store very long items.
Attic Upgrade Part 4 – Insulation Done
-
I finished off the prep work in the attic and blew in all the insulation on
Saturday. We ran the blower for about 4 hours, and we put about 1700 pounds
of ...
7 years ago
No comments:
Post a Comment