- Finished installing the cabinets boxes
- Put in the plywood base for the granite counter tops
- Installed the windows, including building a small bump-out to make the sill deeper on the left one.
- Got the appliance in and working (why don't they provide power cords with ovens and dishwashers?). We are really happy with the black finish.
I have been waiting for the weather to break for about a week, but most there has been rain. I decided that I needed to get the new windows in anyway - I need to go back to work tomorrow. The rain basically stopped as I walked out to get the ladder, and did not start again for about 3 hours!

I hoped to get the sink set, but I ran out of time. I am undermounting it beneith the granite tiles, so I need to get it exactly flush with the plywood base. The rim of the composite sink has some variation in its thickness, so I need to individually shim it in about 14 places. I need to figure out a way that this won't take a week to complete.